• -€11.00
1996 - EUROTUNNEL P.L.C. - LONDRA
1996 - EUROTUNNEL P.L.C. - LONDRA

1996 - EUROTUNNEL P.L.C. - LONDRA

9685
In Stock
€49.00 Our previous price €60.00 -€11.00
Tax included Shipping excluded

1996 - EUROTUNNEL P.L.C. - LONDRA

The Channel Tunnel (French: Le tunnel sous la Manche; also nicknamed the Chunnel)[2][3] is a 50.45-kilometre (31.35 mi) rail tunnel linking Folkestone, Kent, in England, with Coquelles, Pas-de-Calais, near Calais in northern France, beneath the English Channel at the Strait of Dover. It is the only fixed link between the island of Great Britain and the European mainland.

Description

At its lowest point, it is 75 m (250 ft) deep below the sea bed and 115 m (380 ft) below sea level.[4][5][6] At 37.9 kilometres (23.5 mi), the tunnel has the longest underwater section of any tunnel in the world (the Seikan Tunnel in Japan is both longer overall at 53.85 kilometres (33.46 mi) and deeper at 240 metres (790 ft) below sea level). The speed limit for trains through the tunnel is 160 kilometres per hour (99 mph).

The tunnel carries high-speed Eurostar passenger trains, the Eurotunnel Shuttle for road vehicles—the largest such transport in the world[8]—and international goods trains.[9] The tunnel connects end-to-end with the LGV Nord and High Speed 1 high-speed railway lines. In 2017 through rail services carried 10.3 million passengers and 1.22M tonnes of freight, and the Shuttle carried 10.4M passengers, 2.6M cars, 51,000 coaches, and 1.6M lorries (equivalent to 21.3M tonnes of freight).[10] This compares with 11.7 million passengers, 2.6 million lorries and 2.2 million cars through the Port of Dover.

Plans for a cross-Channel fixed link appeared as early as 1802, but British political and press pressure over the compromising of national security had disrupted attempts to build a tunnel.[14] An early attempt at building a Channel Tunnel was made in the late 19th century, on the English side, "in the hope of forcing the hand of the English Government".[15] The eventual successful project, organised by Eurotunnel, began construction in 1988 and opened in 1994. At £5.5 billion (1985 prices),[16] it was at the time the most expensive construction project ever proposed. The cost finally amounted to £9 billion ($21 billion), well over its predicted budget.

Since its construction, the tunnel has experienced a few mechanical problems. Both fires and cold weather have temporarily disrupted its operation.

People have been attempting to use the tunnel to illegally travel to the UK since 1997, creating the ongoing issue of the migrants around Calais on the French side, causing both diplomatic disagreement and violence

Product Details

Place of issue
Londra
Year of issue
1996
Nation of issue
Regno Unito
Rarity Index
R3
Quotation Index
S3
scripofilia

Reviews (0)

No reviews
Product added to wishlist
Product added to compare.